What are the production processes and steps of ASTM A213 316Ti stainless steel seamless steel pipe?

Views : 133
Author : admin
Update time : 2023-12-08 16:11:36

  The steel pipe manufacturer will introduce to you the production process and steps of ASTM A213 316Ti stainless steel seamless pipe as follows

  1、 The production steps of ASTM A213 316Ti stainless steel seamless pipe:

  1. Select high-quality and up to standard 304 and 316L stainless steel raw material pipe blanks, and perform operations such as punching, punching, and annealing.

  2. After completing the above operations, the multi pass cold drawing (cold rolling) process is immediately followed. The cold rolling of pipes is carried out on a multi roll rolling mill, while stainless steel pipes are rolled in a circular pass formed by a variable cross-section circular groove and a fixed conical top.

  3. After cold rolling, ASTM A213 stainless steel seamless steel pipes will have a high yield coefficient and are not suitable for expansion, bending, and other phenomena. In order to meet the hygiene standard of stainless steel pipes, the cold rolled pipes need to undergo steps such as bright annealing, demagnetization, acid washing, and straightening.

  5. The acid washing process of ASTM A213 316Ti stainless steel pipes can remove oil stains, rust spots, welding spots, oxide layers, free iron and other dirt on the surface of the workpiece while passivating. After treatment, the surface becomes uniformly silver white, while preventing metal corrosion and hydrogen embrittlement, and suppressing the generation of acid mist.

  6. After the above process, the next step for ASTM A213 316Ti stainless steel pipes is the polishing process. The standard number of polishing mesh for the inner and outer walls of the pipes is 400 mesh. The surface smoothness of the inner and outer surfaces of the pipes after polishing can reach the mirror standard (i.e. the hygiene standard).

  7. After polishing, the ASTM A213 316Ti stainless steel pipe needs to undergo internal inspection by a metal testing machine (or water pressure test) and strict manual selection by the steel pipe quality inspector. Only qualified products can be packaged and shipped out of the factory.

  2、 The production process of ASTM A213 316Ti stainless steel seamless pipe.

  Production process: 1. Steelmaking → 2. Rolling round steel (peeling) → 3. Piercing (annealing) → 4. Cold drawing → 5. Cold rolling (annealing, demagnetization, acid washing, cleaning) → 6. Inner wall polishing (400 mesh) → 7. Outer wall polishing (400 mesh) → 8. Air pressure testing → 9. Surface testing → 10. Labeling and certification → 11. Packaging → 12. Shipping

  ASTM A213 stainless steel seamless pipe can be seamlessly processed by hot rolling or cold rolling. Hebei Shengtian Pipe Fittings Group Co., Ltd. has a large inventory of ASTM A213 316Ti stainless steel seamless pipe. If you have any questions, please feel free to contact us at [email protected]

Related News
Read More >>
Why should Seamless steel pipes be epoxy powder coated? Why should Seamless steel pipes be epoxy powder coated?
Apr .26.2024
The advantages of epoxy powder coated seamless steel pipes,excellent environmental performance: The hot-dip plastic process used in plastic-coated steel pipes for drainage does not contain harmful substances and meets environmental protection requirements. At the same time, it is recyclable, which is conducive to the recycling of resources.
ASTM A106 Thick-walled steel pipe production steps ASTM A106 Thick-walled steel pipe production steps
Apr .25.2024
ASTM A106 Thick-walled steel pipes: Steel pipes whose outer diameter to wall thickness ratio is less than 20 are called thick-walled steel pipes. It is mainly used as petroleum geological drilling pipes, cracking pipes for the petrochemical industry, boiler steel pipes, bearing steel pipes, and high-precision structural steel pipes for automobiles, tractors, etc.
Shengtian Group successfully participated in the Russian Oil and Gas Exhibition Shengtian Group successfully participated in the Russian Oil and Gas Exhibition
Apr .24.2024
As an expert in the field of pipeline systems, Hebei Shengtian Group actively participated in this exhibition and brought our latest pipeline system solutions, including seamless steel pipe, erw steel pipe, lsaw steel pipe, ssaw steel pipe etc.
Is API 5L Black Steel Pipe Good For Air Lines? Is API 5L Black Steel Pipe Good For Air Lines?
Apr .23.2024
API 5L Black steel pipe gets its name from the dark, protective iron oxide coating on its surface, which gives it its characteristic black color. It has the advantages of being strong, durable, easy to shape, and cheap. However, black metal pipe has a fatal disadvantage that it is prone to rust, because impurity particles such as corrosive gases.