Water Supply System in Russia

Views : 601
Author : admin
Update time : 2023-02-09 09:12:47

  The advantages of natural gas are becoming more and more prominent. In the future, it may become the world's largest energy source beyond oil. Customers from Russia purchased 100 tons of ASTM A106 ERW Steel Pipe for local natural gas projects.

Related News
Read More >>
The Difference Between API 5L Gr.B And A106 Gr.B Sch 40? The Difference Between API 5L Gr.B And A106 Gr.B Sch 40?
Sep .12.2024
API 5L GR.B sch 40 Pipes come from API Spec 5L Specification for Line Pipe with the application of gas, water and oil transportation. Standard Line Pipe has grade designation A and B. API 5L Grade b pipe can be two of API 5L product service level (PSL), that’s is API 5L Gr.B PSL1 and API 5L Gr. B PSL2.
Shengtian Group will attend the Kazakhstan exhibition in Almaty Shengtian Group will attend the Kazakhstan exhibition in Almaty
Sep .10.2024
Hebei Shengtian Pipe Fitting Group will attend the Kazakhstan International Oil and Gas Exhibition in Almaty from September 25th to 27th, 2024. We will be in venue 9, booth number 9-034. New customers are welcome to come and discuss and consult technical issues related to steel pipes and pipe fittings.
The difference between ASTM A192 and A178 Boiler Pipe The difference between ASTM A192 and A178 Boiler Pipe
Sep .05.2024
ASTM A192 Boiler Pipe vs ASTM A178 Boiler Pipe When it comes to selecting the right boiler pipe for your project, there are several factors to consider. Two of the most commonly used boiler pipes are A178 boiler pipe and A192 boiler pipe. While both of these pipes can be used for boiler systems and other applications, they have several key differences that should be noted. In this article, we’ll explore the similarities and differences between A178 boiler pipe and A192 boiler pipe, and provide an overview of their applications and key features.
How to make ASTM A106/A53 seamless steel pipe? How to make ASTM A106/A53 seamless steel pipe?
Sep .03.2024
The production process of ASTM A106/A53 seamless steel pipe is divided into the following steps: round tube blank → heating → perforation → three-roll cross rolling, continuous rolling or extrusion → tube removal → sizing (or diameter reduction) → cooling → straightening → hydraulic pressure Test (or flaw detection) → Mark → Warehouse. Seamless steel pipes are made from steel ingots or solid tube blanks that are perforated into capillary tubes, and then hot rolled, cold rolled or cold drawn.