How to cool A53 large diameter steel pipe after quenching?

Views : 47
Author : admin
Update time : 2025-01-23 09:22:09

  ASTM A53 large-diameter thick-walled steel pipe production process of generally includes hot rolling, hot coiling, casting and other production methods. Large-diameter thick-walled steel pipes are mostly produced in double-sided submerged arc welding (SSAW pipe). After bending, jointing, internal welding, external welding, straightening, and flattening, the products meet the standards of the American Petroleum Institute.

  (1) When quenching, the workpiece must be heated to a higher temperature and cooled at a faster rate, so a large thermal stress will be generated during quenching, especially during quenching and cooling. Temperature changes on the surface and center of a steel ball with a diameter of 26 mm when heated to 700°C and cooled in water.

  (2) In the early stage of cooling, the cooling rate of the surface obviously exceeds that of the center, and the temperature difference between the surface and the center increases continuously. When cooling continues, the cooling rate of the surface slows down, while the cooling rate of the core increases relatively. When the cooling rates of the surface and the core are almost equal, the temperature difference between them reaches a large value.

  (3) Subsequently, the cooling rate of the core is greater than that of the surface, the surface temperature difference gradually decreases, and the temperature difference disappears completely until the core is completely cooled. The process of generating thermal stress in the event of rapid cooling.

  (4) In the initial stage of cooling, the surface layer cools rapidly, and a temperature difference begins to appear between it and the core. Due to the physical characteristics of thermal expansion and contraction, the volume of the surface layer must be reliably contracted, while the high center temperature and large specific volume hinder the free inward contraction of the surface layer, thus forming thermal stress in which the surface layer is pulled and the central part is compressed.

  (5) With cooling, the above-mentioned temperature difference continues to increase, and the resulting thermal stress also increases accordingly. When the temperature difference reaches a larger value, the thermal stress is also larger. If the thermal stress at this time is lower than the yield strength of the steel at the corresponding temperature, it will not cause plastic deformation, but only a small amount of elastic deformation.

  (6) When further cooling, the surface cooling rate slows down, the core cooling rate increases accordingly, the temperature difference tends to decrease, and the thermal stress also gradually decreases. As the thermal stress decreases, the above elastic deformation decreases accordingly.

  ASTM A53 Large-diameter thick-walled steel pipes are mostly used in large-scale steel structure construction as the main support part (steel pipe pile), such as bridge piling, submarine piling, and high-rise building piling.

Related News
Read More >>
Hebei Shengtian Pipe Fitting Group Co., Ltd. will participate in the 2025 Kazakhstan Oil and Gas Exhibition Hebei Shengtian Pipe Fitting Group Co., Ltd. will participate in the 2025 Kazakhstan Oil and Gas Exhibition
Mar .18.2025
Hebei Shengtian Pipe Fitting Group Co., Ltd., a leading manufacturer of high-performance piping solutions, is proud to announce its participation in the Kazakhstan International Oil & Gas Exhibition in Atyrau, Kazakhstan, from April 2 to 4, 2025. The company will exhibit its cutting-edge products and services at Booth K01, reinforcing its commitment to supporting global energy infrastructure development.
What are the process flows for API 5L welding steel pipes? What are the process flows for API 5L welding steel pipes?
Mar .13.2025
API 5L welding steel pipes often uses the Shielded Metal Arc Welding (SMAW) technique, commonly called stick welding. This method uses a stick-shaped electrode to generate an electric arc that melts the metal during welding. The welder uses a flux-coated electrode to protect the weld metal and prevent atmospheric contamination.
A53 Hot-dip galvanized seamless steel pipe production process A53 Hot-dip galvanized seamless steel pipe production process
Mar .11.2025
ASTM A53 Hot-dip seamless pipe is to make molten metal react with iron matrix to produce alloy layer, so that the matrix and coating are combined. Hot-dip galvanizing is to pickle the steel pipe first. In order to remove the iron oxide on the surface of the steel pipe, after pickling, it is cleaned in an ammonium chloride or zinc chloride aqueous solution or a mixed aqueous solution of ammonium chloride and zinc chloride, and then sent to the hot-dip galvanizing tank. Hot-dip galvanizing has the advantages of uniform coating, strong adhesion, and long service life.
What are the ways to reuse waste A312 stainless steel seamless pipe? What are the ways to reuse waste A312 stainless steel seamless pipe?
Mar .06.2025
ASTM A312 Stainless steel pipes are pipes used to transport different types of fluids and are widely used in construction, machinery, chemical industry and other fields. Stainless steel materials have the advantages of high strength, high corrosion resistance, easy processing and not easy to deform, so they have become the preferred material in many industries. Stainless steel pipes can be divided into seamless stainless steel pipes and welded stainless steel pipes according to the production process.